MAC was responsible for all required survey for the hangars, which are part of a new campus of facilities that will support the KC-46A Pegasus aircraft. The project includes the 121,155 sq ft single-bay aircraft depot maintenance hangar and the 80,000 sq ft two-bay aircraft fuel maintenance hangar. The new campus is projected to provide full maintenance production for 90 aircrafts per year and provide a new home for approximately 300 full-time employees supporting the KC-46A program.
The project includes over 37,000 SY of new heavy-duty airfield pavement, designed and constructed in accordance with UFC 3-260-02 for a 25-year design life. The 18.5” P.C. concrete pavement section was designed using PCASE software for use with multiple aircrafts including the B1200 (U30) Aircraft Tug, the KC-135R, C-5A/B Galaxy, C-17A and KC-46A.