MAC was project manager and designer of record for the project which included the replacement of the existing water main loop around three hangars with over 4,500 LF of new 12” ductile iron water main and over 1,210 LF of new 8” water line which was installed inside B2121 and B2122. The external line was installed using a combination of trenching and boring and included 11 building connections. Project included replacement of both Airfield and non-airfield pavement and preparation of UFGS specification 32 13 11, Concrete Pavement for Airfields and Other Heavy-Duty Pavements.
Replace Fire Water Main at B2121, B2122 & B2136
Tinker Air Force Base, Oklahoma